Rogz Control Long Lead Extra Large

$51.99
(No reviews yet) Write a Review
UPC:
HLLOC25
Condition:
New
Availability:
Typically ships within 1 business day

ROGZ Control Long Lead

The Control Lead by Rogz is the perfect lead for taking control of your dog on walks.  Having control of your dog is essential for a happy dog and a happy owner, and the right type of walking equipment can help.

Lead length:  1.2m

Features

  • Shock Absorbing Webbing  Eases the pull strength and pressure placed on your dog.
  • ShocLoc Control  Designed to lock out the absorbing function of the bungee.
  • SnapLoc Trigger Hook  Ensures control and safety for you and your dog.
  • Reflective Stitching  Reflective Yarn woven into webbing and piping for night visibility.
  • Waste Bag Holder  Accessory to hold your waste bag.

 

Material

  • Webbing and Reflective Stitching  Nylon/Polyester
  • Shock Absorber  Neoprene
  • Metal Parts  Zinc